Sandbar Volleyball Facility – Project Spotlight
Utah’s premier indoor/outdoor beach volleyball facility, boasting five indoor courts and a 2,550 square foot mezzanine for spectators and refreshments.
Project Spotlight
Western Steel Buildings partnered with the South Utah Valley Solid Waste District to deliver a large-scale, pre-engineered steel facility designed to improve waste-handling throughput, equipment flow, and operational safety. The 110,250 sq. ft. expansion integrates engineered steel construction with tilt-wall elements, creating a durable structure built for the heavy demands of municipal waste processing.
With a 30′ clear interior height and open-web trusses spaced at 12′-6″ on center, the facility accommodates large loaders, transfer trailers, and continuous equipment movement. Western Steel engineered this structure to perform in corrosive, high-impact waste environments—ensuring long-term reliability, reduced maintenance, and enhanced operational efficiency for mission-critical municipal services.
This project highlights Western Steel’s ability to deliver complex environmental and infrastructure buildings requiring specialized engineering, precision fabrication, and dependable installation.
CLICK PLAY TO BEGIN
“My biggest fear is when we started to build the thing that we’d be missing pieces. I then realized, that through their inventory control process, they already knew that everything was there ahead of time. When I watched it being put together, that’s when I was the most impressed because we had no issues and we were not short any inventory. We wouldn’t have kept the schedule, we wouldn’t be here today, if it wasn’t for the help of Western Steel Buildings.”
— Terry Ficklin,
General Manager at SUVSWD
“We needed a team that was going to look at every little piece of this building and find a structure that fit exactly to the dimensions, to the functionality that we needed for a transfer station. We were concerned about these costs going up because of big clear span spaces, or having to shrink the building because the costs were increasing. And in the end, we added 10,000 square feet to the building in the last two months of design. Western Steel looked at us and said, excellent, we can add that in. We’re still going to keep you on schedule. We’re going to keep you on budget. Western Steel was great. They understood the needs of the municipality.”
— Nick Patterson,
Senior Project Manager at Forsgren & Associates
Build your next municipal building engineered for durability, performance, and heavy industrial operations.
Utah’s premier indoor/outdoor beach volleyball facility, boasting five indoor courts and a 2,550 square foot mezzanine for spectators and refreshments.
Western Steel Buildings engineered and delivered a multi-structure stadium complex for Fort Wayne FC, the Stadium grandstand, Locker Rooms Building, and Fan Experience Building, on one set of drawings and one foundation plan, completed in 14 months.
Built to support ornamental metal fabrication, the RC Ornamental project in Heber, Utah is a 12,720 sq. ft. pre-engineered steel facility by Western Steel Buildings, engineered for efficiency, strength, and consistent performance.
Supporting large-scale commercial operations, the Las Vegas U-Haul Project Spotlight highlights a 44,000 sq. ft. clear-span pre-engineered steel facility engineered by Western Steel Buildings, delivering open interior space, durability, and operational efficiency.
Located at Heber Valley Airport, the Heber Hangars Project Spotlight highlights nine custom aviation hangars built by Western Steel Buildings, featuring tailored sizes, hydraulic door systems, and pre-engineered steel solutions designed for aircraft storage and multi-purpose use.
Designed to support high-volume logistics, the Invest 4F project is a 100,000 sq. ft. pre-engineered steel warehouse in Garrett, Indiana, engineered by Western Steel Buildings with a gable standing seam roof, 30′ eave height, and 16 dock doors to streamline operations.