Heber Gateway Plaza – Project Spotlight
Explore how Western Steel brought to life the Gateway Office Center, showcasing innovative design in a pre-engineered metal building.
Project Spotlight
BPI Labs—an industry leader in pharmaceutical manufacturing—partnered with Western Steel Buildings to create a precision-engineered steel facility designed to support regulated production environments and high-efficiency workflows. Western Steel delivered a 14,900 sq. ft. multi-span pre-engineered building that leverages strategically placed interior columns to optimize structural efficiency across a wide footprint.
The building incorporates a custom insulation package and extensive daylighting features, including (48) 3′ × 5′-4″ light transmitting panels, enhancing interior visibility and contributing to a more efficient manufacturing environment. Engineered for durability, thermal performance, and long-term operational reliability, this facility supports BPI Labs’ commitment to innovation, quality, and compliance.
CLICK PLAY TO BEGIN
Build a high-performance manufacturing facility engineered for precision, efficiency, and long-term reliability.
Explore how Western Steel brought to life the Gateway Office Center, showcasing innovative design in a pre-engineered metal building.
Designed to support high-volume logistics, the Invest 4F project is a 100,000 sq. ft. pre-engineered steel warehouse in Garrett, Indiana, engineered by Western Steel Buildings with a gable standing seam roof, 30′ eave height, and 16 dock doors to streamline operations.
Park City Rain Gutter chose Western Steel Buildings for a quick, energy-efficient, and customizable expansion using Insulated Metal Panels.
Western Steel Buildings provided a durable, custom 12,000 square-foot covered walkway for Honolulu Airport, ensuring comfortable traveler access.
Developed to support regional waste management operations, the South Utah Valley Solid Waste District’s 110,250 sq. ft. transport station expansion was engineered by Western Steel Buildings as a pre-engineered steel and tilt-wall facility built for heavy-duty performance.
Serving advanced manufacturing needs, Novae Corp.’s new 142,035 sq. ft. facility was engineered by Western Steel Buildings and features six connected pre-engineered steel structures with gable, single-slope, and lean-to roof lines, along with a full mezzanine and heavy-duty crane systems for industrial flexibility.